Home About

Since 2012 · Longgang, Shenzhen

A Shenzhen Battery Factory, Factory-Direct Since 2012

EMS-ESS began as a five-bench pack workshop in Longgang. Today it runs 12,000 m² across Shenzhen and Dongguan, 8 pack lines and 1.2 GWh of annual capacity — building home storage, rack, e-mobility and deep-cycle packs for 1,500+ B2B buyers in 45+ countries. No trading desk between you and the line.

EMS-ESS Shenzhen factory with engineers working across the battery pack assembly lines

About EMS-ESS

Factory-Direct Since 2012

From a five-bench workshop in Longgang to 12,000 m² across two sites, eight pack lines and 1.2 GWh a year.

EMS-ESS battery R&D team reviewing a module design and cell test data on monitors in the engineering office

Team & R&D

280+ Engineers and an In-House Test Lab

The engineering group spans BMS firmware, pack structure, electrochemistry and compliance — the same team that quotes your program runs it.

  • BMS firmware team — communication profiles maintained for Deye, Victron, Growatt, Sol-Ark and SMA inverters, with OTA update paths.
  • Electrochemistry lab — eight abuse and environment test categories before any design ships: overcharge, external short, drop, crush, vibration, thermal and humidity exposure.
  • Cell engineering — A-grade EVE LF280K 280Ah cells at ≤0.25 mΩ internal resistance and CATL 314Ah cells at ~180 Wh/kg anchor the ESS platforms.
  • Compliance desk — EU Battery Regulation 2023/1542, CE, IEC 62133-2 and UN38.3 documentation kept current for the markets you sell into.
Quality & Certifications

Milestones

From Five Benches to 1.2 GWh

2012

Founded in Longgang, Shenzhen

Pack assembly for domestic e-bike brands — 36V and 48V packs built by hand, cells matched on a bench multimeter. The lesson that still drives the factory: cell grading decides everything downstream.

2016

First In-House Smart BMS

A dedicated BMS hardware and firmware team replaces third-party boards — CAN bus, custom protection thresholds, and the start of the inverter-protocol library that now covers Deye, Victron, Growatt, Sol-Ark, SMA and Luxpower.

2019

First EU Container

CE and UN38.3 documentation completed for a German home-storage distributor — the 8-test UN38.3 transport file and 16-section MSDS became the standard export pack. Europe now takes 55% of shipments.

2022

Rack Line and the UL 1973 Program

The 19-inch 51.2V 100Ah 4U module line opens for US integrators — 16 modules parallel to 81.92 kWh per cabinet, engineered toward UL 1973 as the entry ticket for stationary storage in North America.

2025

Dual-Site, 1.2 GWh

Eight pack lines across the Shenzhen HQ and the Dongguan plant, 1,500+ B2B clients in 45+ countries. Top brand factories run 6 GWh a year; we deliberately hold OEM scale so custom programs keep engineering attention.

12,000 m²dual-site factory, Shenzhen + Dongguan
280+engineers incl. BMS firmware team
1.2 GWhannual capacity
15–20 dayscustom sample lead time

Our Position

Factory-Direct Terms, No Channel Conflict

Brand-name battery houses do not take custom orders, and trading companies cannot answer engineering questions. EMS-ESS sits in between: a factory that publishes its terms and never competes with your brand.

  • Published OEM terms — standard lines from 10 units for pilots, custom builds from 200–500 pcs, sample fees credited against the first order.
  • Known timelines — samples 15–20 working days after spec sign-off; 100–500 units in ~15 working days; containers in 25–30.
  • Standard payment — 30% deposit, 70% against the bill-of-lading copy, FOB Shenzhen.
  • No retail channel — we manufacture under your label; there is no EMS-ESS consumer brand to collide with.
  • Export pack included — UN38.3 test summary, 16-section MSDS and dangerous-goods declaration with every shipment.
See Delivered OEM Programs
EMS-ESS factory floor at dusk with work lights

Get a Factory Quote in 24h

Send your spec — voltage, capacity, application, annual volume. A battery engineer replies with a costed proposal.