Quality here is three gates and a paper trail: 100% incoming cell re-test at IQC, AQL 0.65 in-process control, and 100% end-of-line testing on every finished pack — all under an ISO 9001-audited QMS, with results tied to each module's barcode for the life of the product.

EMS-ESS quality control station with an engineer testing a battery module

Quality & Certifications

Quality You Can Audit

Three inspection gates and a paper trail — 100% end-of-line testing on every finished pack, under an ISO 9001-audited QMS.

Flat-lay of EMS-ESS certification documents with embossed seals and ribbon stamps

Document Pack

Certificates, Not Brochure Claims

Ask for the scans: UN38.3 test summaries per battery model, IEC 62133-2 CB reports, CE declarations and the ISO 9001 certificate with scope and expiry. Every document names the exact model it covers — a certificate that does not match the shipped model is not coverage.

What Travels With Every Order

  • UN38.3 test summary — issued for the exact model on the packing list, all 8 test items.
  • MSDS — 16-section safety data file formatted for carriers and customs.
  • DG declaration — Class 9 sea freight under IMDG/P903 from Yantian or Shekou.
  • SoC record — air shipments leave at ≤30% state of charge under PI965.
  • Test data per lot — OCV and internal-resistance logs from the 100% end-of-line gate.

Compliance

Certified for EU and US Market Entry

Seven documents cover transport, market entry and factory audit. Certificate numbers, scopes and issue dates are shared on request — verify them against the issuing bodies before you rely on them.

UN 38.3transport, 8 tests
IEC 62133-2CB scheme, EU entry
UL 1973US stationary ESS
UL 9540Athermal runaway data
CELVD / EMC / RED
MSDS16-section DG file

Reading the Wall

What Each Certificate Actually Buys You

CertificationWhat it coversWhat it means for buyers
UN 38.3Transport safety — 8 tests: altitude simulation, thermal, vibration, mechanical shock, external short, impact/crush, overcharge, forced dischargeGlobally mandatory. Without it a lithium battery cannot legally move by sea, air or road.
IEC 62133-2Sealed lithium cell and battery safety; CB Scheme mutual recognitionThe de-facto EU entry standard for e-mobility and portable packs — one report covers many CB-member markets.
UL 1973Stationary ESS battery safety — cell to module to systemCore certification for US stationary storage; also the prerequisite step toward a UL 9540 system listing.
UL 9540AThermal-runaway fire propagation test method, cell to installation levelThe data set US fire authorities (AHJ) and insurers ask for when approving an ESS installation.
CEEU conformity — LVD, EMC, RED directivesMandatory for EU sales; pairs with EU Battery Regulation 2023/1542 obligations your brand carries.
MSDS16-section chemical safety data sheetNot a certificate but a hard requirement — carriers and customs reject freight without it.
ISO 9001Factory quality management systemBaseline your supplier-audit team checks first; our inspection gates below run inside this QMS.

Warranty Policy

Warranty Terms by Product Line

Product lineWarranty termPerformance floor and coverage
Home ESS — wall-mounted & stackable10 yearsCapacity floor 80% of rated at year 10; 6,000+ cycles at 90–95% DoD
19-inch rack modules10 yearsSame 80% floor; parallel systems to 81.92 kWh (16 modules) covered as one system
RV & marine deep-cycle5 years4,000+ cycle platform; Bluetooth SOH log accepted as field evidence
E-bike & scooter packs24 monthsCell and BMS defects covered; cycle expectation 700–2,000+ depending on chemistry
Custom BMS boards24 monthsHardware defects plus firmware OTA and protocol updates through the term

The 10-year ESS term matches what tier-one ESS brands publish — the difference is ours also covers OEM-labeled units, with warranty handled through your brand, not around it.

Three Inspection Gates

IQC, IPQC, OQC — Who Checks What, and When

  • IQC — 100% incoming re-test — capacity and internal resistance verified per cell lot against the supplier grading report; A-grade EVE LF280K lots must measure ≤0.25 mΩ before release to the line.
  • IPQC — in-process control — first-article approval, patrol checks each shift, weld pull-tests and voltage-balance sampling at AQL 0.65.
  • Aging gate — 7-day full-charge hold with self-discharge curves screened against design-of-experiment limits; early-life failures never reach OQC.
  • OQC — 100% final test — open-circuit voltage, internal resistance and insulation withstand on every unit, capacity per lot, then SoC calibrated to 30% for air-freight compliance.
See the Line It Runs On

Buyer Questions

Four Questions Compliance Teams Ask

Can we ship under your UN38.3 certificate?
UN38.3 test summaries are issued per battery model, not per buyer. Each shipment carries the summary matching the exact model on the packing list, plus the 16-section MSDS and dangerous-goods declaration — the three documents carriers actually check.
Is your testing 100% or sampled?
End-of-line testing is 100% — open-circuit voltage, internal resistance and insulation withstand on every unit, with capacity verified per lot. Sampling (AQL 0.65) applies only to in-process checks such as weld pull-tests. Every pack also completes a 7-day full-charge aging hold before final test.
What voids the 10-year home ESS warranty?
Operating outside the specified voltage window (41–58.4V for 51.2V systems), depth of discharge beyond spec, unauthorized BMS firmware, or physical damage. Bluetooth and CAN logs provide the SOH evidence for claims — no teardown dispute needed in most cases.
Can our QC team or a third party inspect before shipment?
Yes. Book SGS, ITS or TÜV directly onto the line, or send your own team to either plant. Pre-shipment inspection includes line records, aging curves and per-module traceability barcodes — everything we check ourselves is open to re-check.